Cement Production Line
Home products Cement production Cement Production Line
Cement Production Line
- High capacity
- High automation
- High quality, low pollutant emission
- Low energy consumption
Hongxing Cement Mill Company mainly produces complete equipment for cement plant, cement making machinery, cement production line and cement plant and can also customize cement machinery and configure various large and medium-sized cement production technical processes.
Process Flow of Cement Making Plant
1 Crushing and Pre-homogenization
(1) Crushing
In the cement production, most of the raw materials need crushing, such as limestone, clay, iron ore, coal, etc. The limestone is of large particle sizes and high hardness after being mined. Therefore, the limestone crushing is the most essential part in cement plants.
(2) Pre-homogenization
Pre-homogenization adopts the scientific method of material piling and fetching, making the raw material yard possess the functions of storage and pre-homogenization.
2 Raw Materials Preparation
At least 3 tons of materials need grinding for producing 1 ton of silicate cement (including all kinds of raw materials, such as fuel, clinker, mixture and plaster). According to the statistics, the dry process cement production line consumes more than 60% of the power of the whole plant, with raw material grinding taking up 30%, coal grinding about 3%, cement grinding about 40%. Therefore, the reasonable choice of grinding equipment and process flow, optimized process parameters, correct operation and the manufacturing control system are highly significant to ensure product quality and reduce the energy consumption.
3 Homogenization
In the new type dry process cement production, stabilizing the ingredients of the raw materials is the precondition of clinker calcining pyrology system. The homogenization system is a final check for the process.
4 Decomposition
The preheater can finish preheating and partial decomposition, replacing part of the functions of the Rotary Kiln and shortening its length and enabling the materials to sufficiently mix with the red-hot air. As a result, the contact area is increased, heat transfer rate quickened, the heat transfer efficiency strengthened, fulfilling the purpose of improving production efficiency and reducing heat consumption .
5 Calcination
The next procedure is clinker calcination. In the Rotary Kiln, the carbonate makes further quick decomposition and a series of solid-phase reactions. With the increase in the temperature, the minerals will become liquid and dissolved in the liquid phase reactions and then form a great amount of clinker. After being calcined, the temperature of the clinker will gradually become low. Finally, the hot clinker will be cooled by the Cooler to the appropriate temperature for conveying, storing and grinding. Meanwhile, the heat will be recycled, thus the heat efficiency improved and clinker quality enhanced.
6 Grinding
As the last process, it is also the most power-consuming process. Its main function exists in grinding cement clinker (also gelling agent, performance adjustment materials, etc.) to the proper sizes, forming a certain grain gradation, increasing hydration area and speeding up hydration rate, meeting the requirements of condensation and hardening of the cement slurry.
7 Packing
There are bagged cements and bulk cements for shipment.
Note: If you're interested in the product, please submit your requirements and contacts and then we will contact you in two days. We promise that all your informations won't be leaked to anyone.